Basic Installation Service
BISESHOP
Description
Basic
Installation Service – Terms & Conditions
- Installation must take place at the same location as
the original unit, with no additional cabling or wiring required.
- The installation service will be performed by an
authorized third‑party installation provider.
- The maximum installation height must not exceed 3
meters, measured from the floor to the structural ceiling.
- Customers will be referred to the third‑party service provider for further assessment and
arrangement if the installation request falls outside the scope of
standard replacement, including:
a. New ceiling mount installations;
b. Additional cabling work;
c. Installation of projector screens;
d. Any other non-standard requirements
* A site visit may be required.
Any additional fees arising from non‑standard services will be
quoted and collected directly by the third‑party service provider.
- The installation service is available within the Hong
Kong SAR. Standard service coverage includes: Hong Kong Island, Kowloon,
and any locations accessible by MTR.
- An additional charge of HK$200 per installation will
apply to service locations outside the areas stated in Clause 5.
Price
HK$ 1,200.00